Specifies the previous operation number and shows the operation that is run directly before the current operation.
Several operations can have the same previous operation number because several operations can follow the same operation when operations are run in parallel.
Example:
If operation 30 has operation 10 in this field, this means that operation 10 is run directly before operation 30.
Tip |
---|
For more information about how to work with fields and columns, see Working with Microsoft Dynamics NAV. For more information about how to find specific pages, see Search. |