Specifies the unit of measure code for the run time to use when you manufacture the item. click the field to see a list of available unit of measure codes.
The program automatically fills in this field when you enter the number of a machine or work center on the line, but you can change it.
Run time is the time required to process or manufacture an item or a lot in a specific operation. Run time does not include setup time.
Note that the throughput time can be expressed in various units of measure. However, if you do so it will affect cost calculations.
Tip |
---|
For more information about how to work with fields and columns, see Working with Microsoft Dynamics NAV. For more information about how to find specific pages, see Search. |