Specifies the total Recognized Cost amount that was last posted to the general ledger for the job. The Recognized Cost G/L amount for the job is the sum of the Recognized Cost Job WIP G/L Entries.

You cannot change the contents of this field.

Tip

See Also

Reference

Job Card